Secondary Steelwork at Brighton Hospital
Balguard Engineering have recently undertaken a range of secondary steelwork improvements at Brighton Hospital.
Less glamourous, but essential secondary steel work installations have taken place around the hospital.
Works have included installing new access ramps, glass balustrades, cranked handrails. In addition open mesh walkways with CAT ladders and access platforms.
During the installation process a lot of surveying was needed to get the installation right first time!